Page Tools
Our mills
Sign up to receive ArcelorMittal Europe – Flat Products news alerts by email
Page tools
Print
Bookmark
Share on
Contact us Contact us
  • Our mills

ArcelorMittal Lesaka


ArcelorMittal Lesaka has two plants located in the towns of Lesaka and Legasa, twenty kilometers apart and both belonging to the region of Navarre. It is the reference centre for ArcelorMittal's pre-painted products in Spain, with a capacity to process 250,000 tonnes of galvanised and painted sheet steel. The combination of the two production processes (Combined Line and Painting Line) allows ArcelorMittal Lesaka to have great flexibility to serve all types of customers.

Installations

  • Combi-Line (Galvanising + Organic Coating line)
  • Electrogalvanising line
  • Organic Coat line (Legasa)
  • Inspection line
  • Pickling line (temporary closed)
  • 2 Cold reduce mills (temporary closed)
  • Temper mill (temporary closed)
  • Batch and open coil annealing (temporary closed)

Products

  • Galvanised coils + easy-film
  • Electrogalvanised coils (Tabstocks)
  • Organic coated coils